Market–Frankford Line

The name of the pictureThe name of the pictureThe name of the pictureClash Royale CLAN TAG#URR8PPP






































Market–Frankford Line
MarketFrankfordLine.svg

SEPTA63rdStreetStationPlatform2007.jpg
Market–Frankford Line train at 63rd Street station in 2007

Overview
TypeRapid transit
SystemSEPTA
StatusOperational
Locale
Upper Darby, Millbourne and Philadelphia, Pennsylvania
Termini
69th Street Transportation Center
Frankford Transportation Center
Stations28
Daily ridership187,449
Websitewww.septa.org/service/mfl/
Operation
OpenedMarch 4, 1907
Owner
City of Philadelphia (Frankford to 15th St)
SEPTA (15th St to 69th St)
Operator(s)1907–39: Philadelphia Rapid Transit Co.
1940–68: Philadelphia Transportation Co.
1968–present: SEPTA
Character
Elevated and underground (in tunnel)
Technical
Line length12.9 mi (20.76 km)
Number of tracks2
Track gauge
5 ft 2 12 in (1,588 mm) Pennsylvania trolley gauge
Electrification600 V DC Third rail[1]
Operating speed55 mph (89 km/h)
Route map

.mw-parser-output .RMboxbox-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2).mw-parser-output .RMinlinefloat:none;width:100%;margin:0;border:none.mw-parser-output table.routemappadding:0;border:0;border-spacing:0;background:transparent;white-space:nowrap;line-height:1.2;margin:auto.mw-parser-output .RMirborder:0;border-spacing:0;display:table;line-height:0;padding:0!important;margin:0 auto!important.mw-parser-output table.routemap .RMsidisplay:inline;font-size:90%.mw-parser-output table.routemap .RMl1padding:0 3px;text-align:left.mw-parser-output table.routemap .RMr1padding:0 3px;text-align:right.mw-parser-output table.routemap .RMltext-align:right.mw-parser-output table.routemap .RMrtext-align:left.mw-parser-output table.routemap .RMl4padding:0 3px 0 0;text-align:left.mw-parser-output table.routemap .RMr4padding:0 0 0 3px;text-align:right.mw-parser-output table.routemap>tbody>trline-height:1.mw-parser-output table.routemap>tbody>tr>tdpadding:0;width:auto;vertical-align:middle;text-align:center.mw-parser-output .RMir>tbody>trdisplay:inline-table.mw-parser-output .RMir>tbody>tr>tdpadding:0;height:20px;min-height:20px.mw-parser-output .RMir .RMovposition:relative.mw-parser-output .RMir .RMicposition:absolute;left:0px;top:0px;padding:0.mw-parser-output .RMir .RMtxline-height:20px;vertical-align:middle;text-align:center.mw-parser-output .RMir .RMspheight:20px;min-height:20px.mw-parser-output .RMir div>.RMtxposition:absolute.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>divline-height:.975;display:inline-block;vertical-align:middle.mw-parser-output .RMir .RMf_height:5px;min-height:5px;width:20px;min-width:20px.mw-parser-output .RMir .RMfmheight:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto.mw-parser-output .RMir .RMowidth:2.5px;min-width:2.5px.mw-parser-output .RMir .RMcwidth:5px;min-width:5px.mw-parser-output .RMir .RMocwidth:7.5px;min-width:7.5px.mw-parser-output .RMir .RMdwidth:10px;min-width:10px.mw-parser-output .RMir .RModwidth:12.5px;min-width:12.5px.mw-parser-output .RMir .RMcdwidth:15px;min-width:15px.mw-parser-output .RMir .RMocdwidth:17.5px;min-width:17.5px.mw-parser-output .RMir .RM_width:20px;min-width:20px.mw-parser-output .RMir .RM_owidth:22.5px;min-width:22.5px.mw-parser-output .RMir .RM_cwidth:25px;min-width:25px.mw-parser-output .RMir .RM_ocwidth:27.5px;min-width:27.5px.mw-parser-output .RMir .RM_dwidth:30px;min-width:30px.mw-parser-output .RMir .RM_odwidth:32.5px;min-width:32.5px.mw-parser-output .RMir .RM_cdwidth:35px;min-width:35px.mw-parser-output .RMir .RM_ocdwidth:37.5px;min-width:37.5px.mw-parser-output .RMir .RMbwidth:40px;min-width:40px.mw-parser-output .RMir .RMcbwidth:45px;min-width:45px.mw-parser-output .RMir .RMdbwidth:50px;min-width:50px.mw-parser-output .RMir .RMcdbwidth:55px;min-width:55px.mw-parser-output .RMir .RM_bwidth:60px;min-width:60px.mw-parser-output .RMir .RM_cbwidth:65px;min-width:65px.mw-parser-output .RMir .RM_dbwidth:70px;min-width:70px.mw-parser-output .RMir .RM_cdbwidth:75px;min-width:75px.mw-parser-output .RMir .RMswidth:80px;min-width:80px.mw-parser-output .RMir .RMdswidth:90px;min-width:90px.mw-parser-output .RMir .RM_swidth:100px;min-width:100px.mw-parser-output .RMir .RM_dswidth:110px;min-width:110px.mw-parser-output .RMir .RMbswidth:120px;min-width:120px.mw-parser-output .RMir .RMdbswidth:130px;min-width:130px.mw-parser-output .RMir .RM_bswidth:140px;min-width:140px.mw-parser-output .RMir .RM_dbswidth:150px;min-width:150px.mw-parser-output .RMir .RMwwidth:160px;min-width:160px.mw-parser-output .RMir .RM_wwidth:180px;min-width:180px.mw-parser-output .RMir .RMbwwidth:200px;min-width:200px.mw-parser-output .RMir .RM_bwwidth:220px;min-width:220px.mw-parser-output .RMir .RMswwidth:240px;min-width:240px.mw-parser-output .RMir .RM_swwidth:260px;min-width:260px.mw-parser-output .RMir .RMbswwidth:280px;min-width:280px.mw-parser-output .RMir .RM_bswwidth:300px;min-width:300px



Legend













































































































































































































































































































Frankford Yard






Frankford





Arrott







B





Church








Frankford Creek






Erie–Torresdale









Amtrak Northeast Corridor
& SEPTA Trenton Line








A





Tioga





Allegheny







B





Somerset








Conrail Delair Branch








A





Huntingdon







B





York–Dauphin







A





Berks





Girard
BSicon PCC.svg Route 15














I-95









Spring Garden


























Lindenwold Line
to Lindenwold













2nd Street












5th Street











8th Street
Broad–Ridge Spur
















Lindenwold Line
to 15–16th & Locust

















Main Line
to Glenside













Jefferson
Station
│ 11th Street

















13th Street–Market


















City Hall
Broad Street Line
























Suburban
Station
│ 15th Street

















19th Street





















22nd Street























Schuylkill River











Amtrak Northeast Corridor


























Amtrak
30th Street

Main Line │ subway










Harrisburg Subdivision






















Amtrak Northeast Corridor
& Keystone Corridor











Media/Elwyn Line



























33rd Street










34th Street











36th Street Portal












37th Street












40th Street Portal











40th Street
diverted trolleys only














Subway–surface trolleys






46th Street





52nd Street





56th Street





60th Street







A





63rd Street








Cobbs Creek








B





Millbourne




















69th Street




































Routes 101 & 102
to Media & Sharon Hill












69th Street Yard









Norristown High Speed Line
to Norristown






























A B




Skip-stop stations





Surface buses connect at all stations









The Market–Frankford Line (MFL) (also called the Market–Frankford Subway–Elevated Line (MFSE), the Market-Frankford El (MFE), the El (/ɛl/), or the Blue Line) is one of two rapid transit lines in Philadelphia, operated by SEPTA. It runs from the 69th Street Transportation Center in Upper Darby, just outside of West Philadelphia, to the Frankford Transportation Center in Near Northeast Philadelphia. With more than 187,000 boardings[2] on an average weekday, it is the busiest route in the SEPTA system. The line has both elevated and underground portions along its full length. Downtown Philadelphia is also served by four stations of the PATCO Speedline rapid transit line which runs between downtown Philadelphia through Camden, New Jersey to Lindenwold, New Jersey.




Contents





  • 1 Route


  • 2 History

    • 2.1 Original subway and expansion


    • 2.2 Reconstruction


    • 2.3 Extension proposal



  • 3 Operation

    • 3.1 Operating times and headways



  • 4 Rolling stock


  • 5 Accidents


  • 6 Stations


  • 7 References


  • 8 Further reading


  • 9 External links




Route


The Market–Frankford Line begins at 69th Street Transportation Center in Upper Darby. The MFL heads east at ground level and passes north of the borough of Millbourne. From there, it enters Philadelphia and is elevated over Market Street until 46th Street, where it curves north and east and then descends underground via a portal at 44th Street. At 42nd Street, the tunnel returns to the alignment of Market Street.


At 32nd Street, the tunnel carrying the SEPTA subway-surface trolley lines joins the MFL tunnel. The MFL tracks are in the center and the trolley tracks are on the outside. 30th Street consists of an island platform between the two innermost tracks for Market–Frankford Line trains, and outboard "wall" platforms for Subway–Surface route 10, 11, 13, 34, and 36 trolleys. After passing beneath the Schuylkill River, the next stop to the east for Market–Frankford Line trains is at 15th Street; Subway-Surface trolleys also have stations at 22nd Street and 19th Street. 15th Street is the central interchange station for the MFL, Subway-Surface trolleys, and Broad Street Line. The Subway-Surface tracks end in a loop beneath Juniper Street at Market just after crossing above the Broad Street Line.


Though it now tunnels in a straight line directly beneath Philadelphia City Hall, prior to 1936, the original MFL trackage between 15th and 13th Street stations separated and looped around the foundation of City Hall (eastbound trains around the south side returning to be westbound trains from the north side).[3] Parts of that original alignment are now used by subway-surface cars as they pass south of City Hall en route to 13th Street station (as well as the bridgework in the ceiling of the southbound platform of the City Hall stop on the Broad Street line). The Market Street tunnel continues east to Front Street and then turns north, where it rises in the median of I-95. The rail line and freeway share an elevated embankment for about ½ mile (0.8 km), including Spring Garden station (which replaced Fairmount station on the Frankford Elevated in 1977). The line then heads under the southbound lanes and over Front Street for about a mile on an elevated structure. The elevated structure then turns northeast onto Kensington Avenue, which after about two miles, merges with Frankford Avenue (which the line follows to its end). Just north of Pratt Street, a curve to the north brings the line to its current terminus at the Frankford Transportation Center, which replaced the original Bridge & Pratt Streets terminal.



History



Original subway and expansion


The original subway tunnel from City Hall to the portal at 23rd Street, as well as the bridge to carry the line across the Schuylkill River, just north of Market Street, were built from April 1903 to August 1905.[4] Construction on the Market Street Elevated west from this point began In April 1904, and the line opened on March 4, 1907, from 69th Street Terminal to a loop around City Hall at 15th Street.[5] The line was elevated west of the river and underground east of the river. The tunnel was also used by streetcar lines, now SEPTA's Subway-Surface lines, that entered the line just east of the river and turned around at the City Hall loop. Philadelphia was unusual in that construction of its initial downtown subway was undertaken using PRT (Philadelphia Rapid Transit Co.) private capital only, with no contribution from public funds.[6]


Extensions took the subway east to 2nd Street on August 3, 1908,[5] and via a portal at 2nd street and several elevated curves it reached the Delaware River between Market Street and Chestnut Street on September 7, 1908.[5] The Delaware Avenue Elevated (also called the Ferry Line, because of the multiple ferries across the river) opened on October 4, 1908,[5] as a further extension south along the river to South Street. The only two stations on this extension were Market–Chestnut and South Street.[5]




Frankford Terminal in 1918, before the construction of the Frankford Elevated


The "First Operating Section" of the Frankford Elevated was planned to extend from Arch Street (connection with PTC Market Street line) to Bridge Street, 6.4 miles (10.3 km). Construction, financed by the City of Philadelphia and managed by the Department of City Transit, was started in September 1915.[7] At that time, construction was anticipated to require about three years.[8] However, construction was slowed because of World War I. By February 1920, 65 percent of the construction work had been completed and 15 percent was under contract. Of the remainder, plans had been completed for ten percent, leaving approximately ten percent of construction "yet to be arranged for".[7] The superstructure had been completed between Dyre Street (south of Pratt Street) to a point just north of Arch Street. However, only two stations had been completed, and six had not been started.[9] Signals, substations and cars had "yet to be arranged for".[10] In 1919, the Public Service Commission of Pennsylvania approved a connection between the Frankford and Market Street lines in 1919, with signals and signal tower to be built by PRT.[7] But the Philadelphia City Solicitor determined that the connection could not be built until a contract for operation had been signed and approved by the PSC.[11] This did not take place until 1922. The line was dedicated on November 4, 1922 and opened for service on November 5.[12][13] Trains from 69th Street alternated between the Frankford and Ferry Line terminals.


Total expenditures by the city for the Frankford El "with its track, substations, equipment and certain rolling stock" was $15,604,000 to December 31, 1929.[14]


The planned – and authorized – second section of the Frankford El, Bridge Street to Rhawn Street with intermediate stations at Comly Street, Levick Street, Tyson Avenue, and Cottman Avenue, 3.0 mi (4.8 km)[9] was not built.


Following the opening of the Delaware River Bridge in 1926, traffic on the Delaware Ave branch declined sharply.[15] Evening, Sunday and holiday service was discontinued on January 24, 1937. Sunday and holiday service was restored from May 30 to September 13, 1937, and again from July 3 to September 12, 1938. The last day of service was May 6, 1939, with the last train departing South Street at 7:00 p.m.[16] Thereafter, the line was closed and dismantled. A replacement bus service was started in 1943 to serve wartime traffic, and continued in operation until 1953.[15] The old interlocking tower and stub remains of the junction with the Ferries Line survived until the realignment into the median of I-95 in 1977.


As part of a program of railroad improvements undertaken by the City of Philadelphia and the Pennsylvania Railroad, a new section of tunnel from 22nd Street to 46th Street was started in 1930,[17] which would allow for removal of the elevated structure east of 46th Street and the old Schuylkill River Bridge. Coinciding with this project, a new bridge was also to be built across the river for automobile traffic; this raised the level of the street to permit the roadway to pass over the underground tracks of the Pennsylvania Railroad near their new 30th Street Station. This resulted in a reduction of vertical clearance under the old elevated structure from 20' to only 8',[17] which was expected to be only a temporary problem until the new subway tunnel was complete. Funding ran out before the subway extension could be finished.[17] Although streetcar tracks were installed in the new Market Street Bridge, there was insufficient clearance to pass any cars under the elevated, and no service would ever be provided over the new tracks.[17] Subway construction resumed in 1947,[3] and the current configuration opened on November 6, 1955.[3] The old elevated structure was removed by June 20, 1956.[3] While the track was redirected into the new subway, a short stub of the old elevated structure remained at 45th Street until the reconstruction of the Market Street Elevated in 2008.


In addition to extending the Market Street subway tunnel west to 46th Street, with new stations at 30th, 34th and 40th streets,[3] a new trolley tunnel was built under Market, Ludlow and 36th streets and the former Woodland Avenue, leading to a new western portal at 40th Street for routes 11, 13, 34 and 36 (route 10 trolleys use a separate portal at 36th and Ludlow). New stations for the trolleys were constructed at 22nd, 30th, 33rd (between Market and Ludlow), 36th (at Sansom), and 37th (at Spruce) streets. The 24th Street trolley station and tunnel portal was abandoned. The tunnel mouth was visible from Market Street[17] until the Philadelphia Gas and Electric Company (now PECO) built an office building on the site in 1969.


Skip-stop operation began on January 30, 1956.[3] In the original skip-stop configuration, in addition to the A and B stops shown on the map above, 2nd and 34th Street were "A" stations, and Fairmount (replaced by Spring Garden) was a "B" station; the A and B designations at these stations were changed to "All-Stop" because of increased patronage in the 1990s. As I-95 was built through Center City Philadelphia in the late 1970s, part of the Frankford El was relocated to I-95's median, and the Fairmount station was replaced by Spring Garden, on May 16, 1977.



Reconstruction


Between 1988 and 2003, SEPTA undertook a $493.3 million[18] complete reconstruction of the Frankford side of the Market–Frankford Line between Frankford Transportation Center and the 2nd Street portal. The new Frankford Elevated was built with new stringers and deck installed on the original columns, thus giving not only a reduction in cost, but also reducing the street-level impact on adjoining neighborhoods. The old ballasted trackage was replaced with a direct fixation system. In addition to the new Elevated structure, all of the stations were replaced with new stations with higher boarding platforms and elevators, allowing customers with disabilities to easily board and depart from Market-Frankford trains. The reconstruction of the Frankford Elevated structure was mostly complete by 2000, with the exception of the elevated section from Dyre Street (just to the south of the Bridge-Pratt terminal) to the Frankford Yard entrance. The basic design of the bearings of the reconstructed Frankford elevated, however, was not appropriate for the repetitive loading from the train traffic. The bearing design did not take into consideration the interaction of the concrete haunches with the steel stringers when loaded by the passing train;[19] and the concrete has started to fracture and drop onto the street below. The problem was first discovered in 1997, but at that time was simply attributed to faulty construction, without evaluation of the root cause. As a temporary fix, SEPTA has installed 10,000 metal mesh belts on the underside of the structure. Estimates for a permanent fix placed the cost at about $20 million, and SEPTA has filed suit against the engineering companies that contributed to the design flaw to recover part of the repair cost.[20][21] Work on the permanent fix is currently underway.


SEPTA then undertook a $567 million complete reconstruction of the Market Street Elevated between 69th Street Transportation Center and the 44th Street portal between 1999 and 2009.[22] The New Market Street Elevated was an entirely new structure, utilizing single-pillar supports in place of the old-style dual pillar design, allowing the Pennsylvania Department of Transportation (PennDOT) to undertake a planned widening project on Market Street to four lanes between 63rd Street and 44th Street. In addition to the new Elevated structure, all of the stations (including Millbourne) were again replaced with new stations having higher boarding platforms and elevators, allowing customers with disabilities to easily board and depart from trains. The reconstruction of the Market St. Elevated superstructure was completed in 2008, and the last station, 63rd Street, was completed and reopened on May 4, 2009.[23] The Market St. Elevated is not of the same design as the Frankford Elevated, so it does not share any of the Frankford design flaws.


In 2003, the Bridge-Pratt terminal was closed and replaced with the new Frankford Transportation Center.[24] After Bridge-Pratt closed, the station platforms and the remaining unrebuilt elevated structure above Frankford Avenue and Bridge Street were demolished. The new $160 million Frankford terminal facility was built on a tract of land off Frankford Avenue formerly part of the adjacent bus and trackless trolley service depot.


In November 2011, the Federal Transit Administration (FTA), through its competitive Fiscal Year 2011 Sustainability Initiative, awarded $1.4 million to SEPTA to install a "wayside energy storage system" on the Market-Frankford line. The system stores energy from braking trains in a battery that may be used later.[25]



Extension proposal


An extension of the Market–Frankford Line from Frankford to Roosevelt Boulevard and Bustleton Avenue has been proposed in conjunction with an extension of the Broad Street Subway.[26]



Operation




An "A" train arriving at Girard.




Market–Frankford Line train at 30th Street Station (June 2006)


As with many other rail lines, the signal system on the Market–Frankford Line has progressed from the original lineside block signals using semaphores, to three-aspect Type D color light (green, over yellow, over red) signals, to cab signalling, eliminating the lineside block signals except at interlockings.


The Market-Frankford line is unusual as subway-elevated systems go. Notable features include being built with Pennsylvania trolley gauge of 5 ft 2 14 in (1,581 mm),[27][1] and in its use of bottom-contact or underrunning third rail. As such, any possible future physical connection to other rapid-transit lines in Philadelphia is limited to cross-platform transfer only, as both the Broad Street Subway and the Norristown High-Speed Line are standard gauge (4 ft 8 12 in (1,435 mm)) with top-contact third rail. The Market–Frankford Line and Metro-North Railroad are the only railroads in North America that use bottom-contact third rail, known as the Wilgus-Sprague system.[28] Its advantages include a reduced risk of electrocution for track workers and fewer disruptions due to icing conditions during winter weather.[29]
The Market-Frankford Elevated's original construction also had some marked differences from that of other US elevated systems (such as Chicago or New York City). While those systems' elevated lines were built with rails laid on ties (sleepers) that were bolted directly to large steel girders, the Market-Frankford's structure consisted of steel girders supporting a concrete trough deck, which then supported the more conventional railroad construction of rails laid on floating ties with loose rock ballast. This was done in an attempt to reduce noise and vibration, as well as protect the streets below from rain and "operational fluids."[4][30]


During rush hours (trains beginning from about 7 a.m. to 8:30 a.m. and 4:00 p.m. to 5:30 p.m.), SEPTA uses skip-stop operation. Trains marked "A" stop only at the stations marked "A" and "All Trains" on system maps, and "B" trains stop only at "B" and "All Trains" stations.


The base fare for riding the line is $2.50.[31] Payment of base fare includes free transfer to the Subway-Surface Lines at 30th, 15th, and 13th Street stations, as well as to the Broad Street Line at 15th street. While the Broad-Ridge Spur connects at 8th St. Station, there is no longer a free-transfer passageway between the lines. Transfers cost $1.00.[32]


SEPTA's "TransPass"[33] and "TrailPass"[34] weekly/monthly zone-based passcards are also accepted as fares. Use of these passcards is unlimited during their valid dates, making paid transfers unnecessary.


In FY 2005, 25,220,523 passengers rode the Market–Frankford Line. Weekday average ridership of 178,715 made it the busiest line in the entire SEPTA system. The Market–Frankford Line required 142 vehicles at peak hours, cost $86,644,614 in fully allocated expenses, and collected $54,309,344 in passenger revenues, for an impressive farebox recovery ratio of 63 percent.[35]


On February 11, 2008, SEPTA expanded morning and afternoon weekday service with off-peak trains running every six minutes instead of eight. This represents a 12% increase in MFL Service throughout the day.[citation needed]



Operating times and headways


A local trip along the entire line takes about 40 minutes. Trains run from approximately 5:00 am to 1:00 am, with a timed-transfer at 12:30 am at City Hall station to connect with the Broad Street Line based on final trains. The Market-Frankford Owl bus service replaces the subway throughout the night Monday through Friday mornings, stopping at the same locations as the subway trains. The line itself ran 24 hours a day until it was eliminated in 1991; it was reinstated on June 20, 2014 for Friday and Saturday overnights only on a trial basis. It was made permanent on October 8, 2014. Since 2014, the line runs nonstop from 5:00 a.m. on Friday to 1:00 a.m. on Monday morning.


The Market–Frankford Line carries a daytime frequency of six minutes on weekdays (off peak), and ten minutes on weekends. It runs every 12 minutes during night service, with a 20-minute headway during weekend night owl service, and 15 minutes on the night owl bus service Monday through Friday mornings (late Sunday through Thursday nights). During rush hour, the line utilizes a four-minute headway for its skip-stop service on the trunk of the line, with A and B trains respectively running every eight minutes.



Rolling stock


The original cars for the Market Street subway, numbered 1–135 and later designated as Class A-8 by SEPTA's predecessor, the Philadelphia Transportation Company (PTC), were built by the Pressed Steel Car Co. of Pittsburgh, Pa. between 1906 and 1911. An additional set of cars, numbered 136–215, were built by the J.G. Brill Co. of Philadelphia, Pa. between 1911 and 1913.[36] The Frankford Elevated portion opened in 1922 along with another set of cars, numbered 501–600, also built by Brill that year, later receiving the designation Class A-15.[36] The two rail lines were soon merged, resulting in a combined fleet of 315 cars (215 Market Street cars, 100 Frankford cars).[36] By 1960, when the PTC began replacing the cars, the Market Street cars had been in operation for 56 years, thus having the longest lifespan of any Philadelphia subway cars, surpassing that of the original Broad Street subway fleet, which had 54 years of operation. The Frankford cars phased out at 38 years of operation. After retirement, two of the "Market" cars (cars 69 and 163)[36] and six of the "Frankford" cars were retained as work train cars (Cars #532, 551, 559, 583, 585, and 589) for some time.[36] It is currently unknown when these cars were withdrawn, but all had been removed from SEPTA property by the 1970s, with none reported to have been saved for museums.


The "Market" and "Frankford" cars were replaced by a fleet of 270 new stainless steel cars[36] built in 1960 by the Budd Company. The PTC had designated Class A-49 cars numbered 601–646 as Class A-49, and numbers 701–924 as A-50 and A-51.[36] All cars were re-designated as Class M-3 when SEPTA assumed operation of the line. The cars had been nicknamed "Almond Joys" by many riders as their distinctive ventilation fan housings resembled the almonds atop the Peter Paul (now Hershey's) Almond Joy bar. These cars, while mostly an improvement in quality compared to their predecessors, had been plagued with faulty wheel frame assemblies, causing the body to shake, sometimes violently, as the car moved.[37] The cars' fan housings had provisions for air conditioning units,[38] however, only one car, number 614, had ever been air conditioned, which the transit authority had found to be uneconomical at the time.


Early in their service lives, some M-3 cars had fareboxes by their center side doors; these were necessary for collecting fares during the hours after midnight, when SEPTA closed cashier's booths at many stations during the era of 24-hour rapid transit service. "Night Owl" service (midnight–5:00 AM) trains operated on a twenty-minute headway (interval between trains) at that time.[39] SEPTA now operates (along with the Broad Street Subway) all "Owl" service using buses, but similar to the old "Owl" trains, they run between 69th Street and Frankford Transportation Center on a slightly more frequent 15-minute interval.




M-4 car placard


In the early 1990s, the Market–Frankford Line was in need of new rolling stock. The M-3 cars were approaching the end of their expected useful lifespan, as well as being increasingly scrutinized for their shaky ride quality and lack of air conditioning. SEPTA placed an order for 220 new rail cars, each costing $1.29 million.[40]


These cars, designated Class M-4, were manufactured by Adtranz (now Bombardier Transportation) and delivered between 1997 and 1999. These cars are equipped with AC traction motors, air conditioning, LCD signage, and automated announcements. All of the M-3 cars were retired after the last of the M-4's entered service, with five of the former being converted to work cars. The five remaining M-3's were later retired, with M-4 cars 1033 and 1034 replacing them for work service, and the last of the remaining M-3's had been scrapped by 2005. Two of the M-3's have been preserved, cars 606 and 618 at the Pennsylvania Trolley Museum and the Seashore Trolley Museum, respectively. These cars represent the only preserved examples of Market-Frankford line rolling stock. However, some M-3s were regauged to work on the Norristown High Speed Line during the delivery of the N-5 cars.


In February 2017, SEPTA temporarily removed about 90 M-4 cars from service after inspections revealed cracks and signs of fatigue in load-bearing bolsters and associated components.[41]



Accidents


On December 26, 1961, one man died and 38 others sustained non-life-threatening injuries when four cars of a train derailed while rounding the curve just north of York-Dauphin Station. The deceased was identified as Earl Giberson, a 64-year-old man.[42]


On March 7, 1990, four people were killed and another 162 injured when the rear three cars of six-car train #61 derailed after leaving 30th Street Station westbound at 8:20 a.m. It is believed that one of the traction motors dropped out of the rear truck on the third car (M3) somewhere between 15th and 30th street stations, and it became entangled in a switch immediately upon leaving 30th street station. The front truck of the fourth car (M3 #818) followed the third car, while the rear truck of the fourth car took the diverging track, causing the car to shear halfway upon striking the steel pillars separating the tracks beyond the switch.[43][44][45]



Stations


All connections, unless otherwise noted, are operated by SEPTA.
















































































































































































Station

Miles (km)
A
B
Connections
Notes

69th Street Transportation Center
0.0 (0.0)



BSicon TRAM.svg Routes 101 and 102
BSicon SUBWAY.svg Norristown High Speed Line
Bus transport City Bus: 21, 30, 65, 68
Bus transport Suburban Bus: 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 120, 123, 126
Western terminus, Located in Upper Darby, PA.

Millbourne
0.4 (0.6)



Bus transport City Bus: 21
Originally called 66th Street, rebuilt station opened June 16, 2008

63rd Street
0.8 (1.3)



Bus transport City Bus: 21, 31


60th Street
1.1 (1.8)



Bus transport City Bus: 46
Rebuilt station opened June 18, 2007

56th Street
1.5 (2.4)



Bus transport City Bus: 31, G
Rebuilt station opened February 27, 2006

52nd Street
1.9 (3.1)



Bus transport City Bus: 31, 52


46th Street
2.5 (4.0)



Bus transport City Bus: 31, 64
Rebuilt station opened April 14, 2008

40th Street
3.2 (5.1)



BSicon TRAM.svg Subway–Surface Trolleys: 10, 11, 13, 34, 36 (diverted/nighttime routes only)
Bus transport City Bus: 30, 40, LUCY
Original station was elevated

34th Street
3.7 (6.0)



Bus transport City Bus: 31, 49, LUCY
Original station was elevated

30th Street
4.1 (6.6)



BSicon BAHN.svg Amtrak: Northeast Corridor and Keystone Corridor services (at 30th Street Station)
BSicon BAHN.svg Regional Rail (at 30th Street Station)
BSicon BAHN.svg NJ Transit: Atlantic City Line (at 30th Street Station)
BSicon TRAM.svg Subway–Surface Trolleys: 10, 11, 13, 34, 36
Bus transport City Bus: 9, 30, 31, 44, 49, 62, 78, LUCY
Bus transport Suburban Bus: 124, 125
Original station at 32nd Street was elevated

15th Street
5.1 (8.2)



BSicon BAHN.svg Regional Rail (at Suburban Station)
BSicon SUBWAY.svg Broad Street Line (at City Hall)
BSicon TRAM.svg Subway–Surface Trolleys: 10, 11, 33, 34, 36
Bus transport City Bus: 4, 16, 17, 27, 31, 32, 33, 38, 44, 48, 62, 78
Bus transport Suburban Bus: 124, 125
Access to City Hall

13th Street
5.4 (8.7)



BSicon TRAM.svg Subway–Surface Trolleys: 10, 11, 33, 34, 36
Bus transport City Bus: 17, 33, 38, 44, 48, 62
Bus transport Suburban Bus: 124, 125
Eastern terminal for Trolley Lines. Access to Wanamaker Building.

11th Street
5.6 (9.0)



BSicon BAHN.svg Regional Rail (at Jefferson Station)
Bus transport City Bus: 23, 45
Bus transport Greyhound and NJ Transit Bus (at Philadelphia Greyhound Terminal)
Access to Jefferson Station and The Gallery.

8th Street
5.8 (9.3)



BSicon SUBWAY.svg PATCO Lindenwold Line
BSicon SUBWAY.svg Broad-Ridge Spur
Bus transport City Bus: 47, 61


5th Street
6.0 (9.7)



Bus transport City Bus: 57 (south)
Access to Independence NHP.

2nd Street
6.3 (10.1)



Bus transport City Bus: 5, 17, 21 (west), 33, 42 (west), 48
Access to Old City District and Penn's Landing

Spring Garden
7.1 (11.4)



Bus transport City Bus: 25, 43
Replaced the Fairmount station in 1977 when I-95 was built

Girard
7.8 (12.6)



BSicon TRAM.svg Route 15 Trolley
Bus transport City Bus: 5, 25


Berks
8.5 (13.7)



Bus transport City Bus: 3


York–Dauphin
8.9 (14.3)



Bus transport City Bus: 3, 39, 89
Split between York northbound and Dauphin southbound, original name of station was Dauphin-York)

Huntingdon
9.3 (15.0)



Bus transport City Bus: 3, 39, 54


Somerset
9.6 (15.4)



Bus transport City Bus: 3, 54


Allegheny
10.2 (16.4)



Bus transport City Bus: 3, 60, 89


Tioga
10.6 (17.1)



Bus transport City Bus: 3, 89
Original station building on northbound side (in Harrowgate Park) is preserved (only octagonal structure on the line)

Erie–Torresdale
11.3 (18.2)



Bus transport City Bus: 3, 56
Originally called Torresdale

Church
11.8 (19.0)



Bus transport City Bus: 3, 5
Originally called Ruan-Church

Arrott Transportation Center
12.3 (19.8)



Bus transport City Bus: 3, 5, 59, 75, 89, J, K
Named Margaret–Orthodox until 2014; originally called Margaret–Orthodox–Arrott

Frankford Transportation Center
12.9 (20.8)



Bus transport City Bus: 3, 5, 8, 14, 19, 20, 24, 25, 26, 50, 58, 66, 67, 73, 84, 88, R, Boulevard Direct
Eastern terminus, station replaced Bridge-Pratt (Frankford Terminal)


References




  1. ^ ab UrbanRail. "SEPTA"..mw-parser-output cite.citationfont-style:inherit.mw-parser-output .citation qquotes:"""""""'""'".mw-parser-output .citation .cs1-lock-free abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .citation .cs1-lock-limited a,.mw-parser-output .citation .cs1-lock-registration abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .citation .cs1-lock-subscription abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registrationcolor:#555.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration spanborder-bottom:1px dotted;cursor:help.mw-parser-output .cs1-ws-icon abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/4/4c/Wikisource-logo.svg/12px-Wikisource-logo.svg.png")no-repeat;background-position:right .1em center.mw-parser-output code.cs1-codecolor:inherit;background:inherit;border:inherit;padding:inherit.mw-parser-output .cs1-hidden-errordisplay:none;font-size:100%.mw-parser-output .cs1-visible-errorfont-size:100%.mw-parser-output .cs1-maintdisplay:none;color:#33aa33;margin-left:0.3em.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-formatfont-size:95%.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-leftpadding-left:0.2em.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-rightpadding-right:0.2em


  2. ^ "SEPTA Route Statistics" (PDF).


  3. ^ abcdef Cox (1967), p. 32.


  4. ^ ab Cox (1967), p. 6-7.


  5. ^ abcde Cox (1967), p. 16.


  6. ^ Cudahy (2003), p. 279.


  7. ^ abc Twining (1920), p. 18.


  8. ^ City of Philadelphia, Department of City Transit. 1922. The first operating sections of the Frankford elevated railway and Bustleton surface line: a souvenir booklet giving a brief account of their construction, equipment and operating agreement


  9. ^ ab Twining (1920), p. 17.


  10. ^ Twining (1920), p. 14.


  11. ^ Twining (1920), p. 19.


  12. ^ Cox (1967), p. 17.


  13. ^ "Market-Frankford Subway-Elevated Line". SEPTA. Retrieved September 8, 2008.


  14. ^ Report of Transit Advisory Committee to General Conference on Transit Situation in Philadelphia. May 24, 1930. (The "Letter of Transmittal" is signed by J.A. Emery, Chairman, and Milo R. Maltbie, W. K. Myers and S. M. Swaab), p14


  15. ^ ab Cox (1967), p. 24.


  16. ^ Philadelphia Inquirer, May 7, 1939, p.1


  17. ^ abcde Cox (1967), p. 28.


  18. ^ The Frankford Elevated Reconstruction Project


  19. ^ SEPTA v. PTC Expert Report


  20. ^ Paul Nussbaum, "Frankford El with potential to crumble needs repairs", Philadelphia Inquirer, Sep. 18, 2009


  21. ^ Paul Kurtz, "Septa Sues Two Companies Over Crumbling 'El' Structures", KYW News, Sept. 18, 2009


  22. ^ http://www.theelseptaatwork.com/ (September 2006).


  23. ^ "SEPTA (July 2006). SEPTA Capital Improvements in the City of Philadelphia. pp. 7&8" (PDF). Archived from the original (PDF) on 2008-10-09. (1.96 MB)


  24. ^ "SEPTA (July 2006). SEPTA Capital Improvements in the City of Philadelphia. p. 5" (PDF). Archived from the original (PDF) on 2008-10-09. (1.96 MB)


  25. ^ FTA divides $112 million among 46 "green" transit projects Archived 2012-04-19 at the Wayback Machine, Railway Track & Structures,November 18, 2011


  26. ^ Stofka, Steve (2011-05-25). "Crossing the Lines: Extending the Market-Frankford Line". Crossing the Lines. Retrieved 2016-04-21.


  27. ^ Philadelphia Rapid Transit Company. 1908. "Philadelphia's Rapid Transit: Construction and Equipment of the Market Street Subway and Elevated"


  28. ^ Cudahy (2003), p. 202.


  29. ^ Middleton, William D. (September 9, 2002). "Railroad Standardization – Notes on Third Rail Electrification". Railway & Locomotive Historical Society Newsletter. 27 (4): 10–11.


  30. ^ Market Street Elevated Railroad


  31. ^ SEPTA: Fares


  32. ^ SEPTA: Transit Fares


  33. ^ "TransPass". SEPTA. Retrieved December 3, 2012.


  34. ^ "Trailpass". SEPTA. Retrieved December 3, 2012.


  35. ^ "SEPTA (May 2006). Annual Service Plan 2007." (PDF). p. 79. Archived from the original (PDF) on 2007-01-05. (539 KB)


  36. ^ abcdefg Cox (1967), p. 34-35.


  37. ^ MFSE Cars. Trolleyville.com. Retrieved on 2014-04-12.


  38. ^ Frankford M-3 article


  39. ^ Trainstation.com video description


  40. ^ NYCSubway.org


  41. ^ "Cracks prompt SEPTA to pull 90 subway cars from service". Progressive Railroading. February 7, 2017. Retrieved November 23, 2017.


  42. ^ http://34st.com/2003/11/node-2028/


  43. ^ deCourcy Hinds, Michael (March 8, 1990). "Philadelphia Subway Crash Kills 3; 150 Are Hurt". New York Times.


  44. ^ AP Wire (March 9, 1990). "Dragging Motor Is Suspected in Subway Accident". New York Times.


  45. ^ NTSB Report Number: RAR-91-01 (April 23, 1991). "Derailment of Southeastern Pennsylvania Transportation Authority (SEPTA) Commuter Train 61 Philadelphia, Pennsylvania March 7, 1990".



Further reading



  • Cox, Harold E. (1967). May, Jack, ed. The Road from Upper Darby. The Story of the Market Street Subway-Elevated. New York, NY: Electric Railroaders' Association. OCLC 54770701.


  • Cudahy, Brian J. (2003). A Century of Subways: Celebrating 100 Years of New York's Underground Railways. New York: Fordham University Press. ISBN 0-8232-2292-6.


  • Pawson, John R. (1979). Delaware Valley Rails: The Railroads and Rail Transit Lines of the Philadelphia Area. John R. Pawson. ISBN 0-9602080-0-3.


  • Twining, William S. (March 30, 1920). A Report to the City Council of Philadelphia on the Frankford Elevated Railway - With a Statement showing funds required to complete and equip the line - Also data relative to leasing the road – As requested in resolution of the City Council January 20, 1920. City of Philadelphia, Department of City Transit.


  • Williams, Gerry (1998). Trains, Trolleys & Transit: A Guide to Philadelphia Area Rail Transit. Piscataway, NJ: Railpace Company. ISBN 978-0-9621541-7-1. OCLC 43543368.


External links


Route map:




KML file (edit • help)

Template:Attached KML/Market–Frankford Line

KML is from Wikidata




  • Market-Frankford Line on SEPTA website


  • Historic American Engineering Record (HAER) No. PA-430, "Frankford Elevated"

  • HAER No. PA-430-A, "Frankford Elevated, Pratt Street Station"

  • HAER No. PA-430-B, "Frankford Elevated, Church Street Station"

  • NYCsubway.org – SEPTA Market–Frankford Line

  • Stan's Railpix – Septa Photo Gallery Page 3* SEPTA Market–Frankford Line Pictures










Popular posts from this blog

倭马亚王朝

Gabbro

托萊多 (西班牙)