Perambur Loco Works railway station

The name of the pictureThe name of the pictureThe name of the pictureClash Royale CLAN TAG#URR8PPP



























Perambur Loco Works
Station of Chennai Suburban Railway and Southern Railways.

PeramburLocoWorks View1.jpg
Perambur Loco Works railway station

Coordinates
13°06′30″N 80°13′32″E / 13.10836°N 80.22555°E / 13.10836; 80.22555Coordinates: 13°06′30″N 80°13′32″E / 13.10836°N 80.22555°E / 13.10836; 80.22555
Owned by
Ministry of Railways, Indian Railways
Line(s)
West, West North and West South lines of Chennai Suburban Railway
Platforms3
Tracks4
Construction
Structure typeStandard on-ground station
ParkingAvailable
Other information
Station codePEW
Fare zoneSouthern Railways
History
Electrified29 November 1979[1]
Previous namesMadras and Southern Mahratta Railway

Perambur Loco Works is a suburban railway station in the Perambur area of the city of Chennai in India. It serves the Integral Coach Factory (ICF) that is one of the largest railroad carriage and locomotive manufacturers in the world. The station serves growing areas like Periyar Nagar and Jawahar Nagar localities in the north-west corner of Chennai. The station has an elevation of 7.01 m above sea level.



History




View of the station towards west




View of the station towards east


The Perambur region has been a part of the Chennai city since the middle of the 18th century. The Southern Railway's workshop located here was established in the year 1856 to serve the erstwhile Madras and Southern Mahratta Railway Company. It was a combined locomotive, carriage and wagon POH, and coach-building workshop and was later bifurcated in 1932 to deal with carriage and wagon POH activity only, shifting the locomotive overhaul activity to the new Loco workshop which was built adjacent to the original workshop. These two workshops are served by Perambur Carriage Works and Perambur Loco Works stations, respectively. In 1951, the Southern Railway was formed by integrating the erstwhile South Indian Railway company, Madras and the Southern Mahratta Railway Company, and Mysore State Railway with all their workshops and assets. The subway to the platform work is in progress. This subway will be of great help for commuters as they have to walk a long distance to take foot over bridge. This new construction will also prevent crossing track and avoid accident.


The lines at the station were electrified on 29 November 1979, with the electrification of the Chennai Central–Tiruvallur section.[1]



See also


  • Chennai Suburban Railway

  • Integral Coach Factory

  • Regional Railway Museum

  • Railway stations in Chennai



References






  1. ^ ab "IR Electrification Chronology up to 31.03.2004". History of Electrification. IRFCA.org. Retrieved 17 Nov 2012..mw-parser-output cite.citationfont-style:inherit.mw-parser-output qquotes:"""""""'""'".mw-parser-output code.cs1-codecolor:inherit;background:inherit;border:inherit;padding:inherit.mw-parser-output .cs1-lock-free abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-lock-subscription abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registrationcolor:#555.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration spanborder-bottom:1px dotted;cursor:help.mw-parser-output .cs1-hidden-errordisplay:none;font-size:100%.mw-parser-output .cs1-visible-errorfont-size:100%.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-formatfont-size:95%.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-leftpadding-left:0.2em.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-rightpadding-right:0.2em



























Popular posts from this blog

用户:Ww71338ww/绘画

自由群

卑爾根