A465 road

The name of the pictureThe name of the pictureThe name of the pictureClash Royale CLAN TAG#URR8PPP













A465 shield


A465
Route information
Maintained by English local authorities and South Wales Trunk Road Agency
Length66 mi (106 km)
Major junctions
West end
Llandarcy
51°38′57″N 3°50′55″W / 51.6492°N 3.8486°W / 51.6492; -3.8486 (A465 road (western end))
 
[ M 4  ]M4 motorway Junction 43
A48 A48 road
A474A474 road
A4230A4230 road
A4109A4109 road
A4061A4061 road
A4059A4059 road
A470A470 road
A4054A4054 road
A4060A4060 road
A469A469 road
A4048A4048 road
A4046A4046 road
A4047A4047 road
A467A467 road
A4077A4077 road
A4143A4143 road
A4042A4042 road
A40 A40 road
A49 A49 road
East end
Bromyard, Herefordshire
52°11′13″N 2°30′50″W / 52.1870°N 2.5139°W / 52.1870; -2.5139 (A465 road (eastern end))
Location
Primary
destinations

Neath
Merthyr Tydfil
Abergavenny
Hereford

Road network


  • Roads in the United Kingdom
  • Motorways

  • A and B road zones


The A465, the Neath to Abergavenny Trunk Road,[1] is in Wales. The section westwards from Abergavenny is more commonly known as the Heads of the Valleys Road because it joins together the northern heads of the South Wales Valleys. Approximately following the southern boundary of the Brecon Beacons National Park, the Ordnance Survey Pathfinder guide describes it as the unofficial border between rural and industrial South Wales.[2] The A465 provides an alternative and toll-free route between England and the counties in South West Wales and to the ferries to Ireland.[3]




Contents





  • 1 Route

    • 1.1 Major upgrade



  • 2 See also


  • 3 References


  • 4 External links




Route


The A465 runs southwest from Bromyard towards the River Lugg, from where it runs concurrently with the A4103 for a short distance before entering Hereford. After a short distance on the A49, it crosses the River Wye, the River Monnow and the border into Wales. The A465 meets the A40 trunk road in Abergavenny and continues west through the heads of the valleys region past Brynmawr, Ebbw Vale, Tredegar, Rhymney, Merthyr Tydfil, Hirwaun, Glynneath and Aberdulais.




The A465 runs over the former Merthyr, Tredegar and Abergavenny Railway line (1965)


Even before the construction of the Heads of the Valleys road began in the 1960s, there were concerns and complaints regarding the capacity and safety of a single carriageway, three-lane design. The Abergavenny–Neath trunk road opened in 1964.[4]


Until 1996, the A465 ran for most of its length between Glynneath and Aberdulais along a narrow single carriageway road, now redesignated as the B4242. The high accident rate on this stretch was one of the factors leading to the construction of a dual carriageway between these points. Now all of the section of the A465, from Hirwaun to Llandarcy, is dual carriageway.[5][6]


The highest point (signposted) of 1,350 feet (410 m) is on the Ebbw Vale section which is now dual carriageway and slip roads between Dowlais Top and Tredegar via Rhymney. At Dowlais Top there are link roads such as the A4060, which runs down to the south end of Merthyr Tydfil and links with the A470, and the A4054 which goes through Merthyr Vale and Aberfan. Another link is the A4102 which leads into Dowlais and Merthyr Tydfil town centre. The A465 passes Prince Charles Hospital in Merthyr Tydfil and then continues to Cefn-coed-y-cymmer and the A470 link. It then continues down the floor of the Vale of Neath, bypassing Resolven, Neath and Skewen, before terminating at junction 43 of the M4 at Llandarcy.



Major upgrade


In 1990, a regional traffic study identified the need for improvements to the A465. In 1994, alternatives were presented for Public Consultation for the improvement of the 25-mile length between Abergavenny and Hirwaun, connecting the existing A465 dual carriageway link from Swansea to the A40, which is an important part of the route to the M50. In July 1995 the then Secretary of State for Wales announced the Preferred Route. This mainly consisted of widening the existing road to provide a dual carriageway standard with grade-separated junctions (and extra climbing lanes on certain hills) between Abergavenny and Hirwaun. The design was developed and a draft Line Order was published in 1997. This was tested at Public Local Inquiry in 1998 after which the Secretary of State for Wales announced the decision to proceed with the scheme in 1999.


Much of the land on the route is undulating, but despite this, the preferred route alignment is considered to be of high standard and as such allows most of the route to have the national speed limit.[7]


The scheme was split up into seven sections, with sections 6 and 7 later being combined into a single scheme for the purposes of construction. The First Minister has repeated on a number of occasions the promise that the dualling of the road will be complete by 2020.






































A465 upgrade sections are
SectionFrom / ToCommencement dateCompletion dateStatus
1
Abergavenny to Gilwern
February 2005May 2008Complete
2
Gilwern to Brynmawr
December 2014[8]Due by 2019[9]Under construction
3
Brynmawr to Tredegar
January 2013September 2015Complete
4
Tredegar to Dowlais Top
March 2002November 2004Complete
5
Dowlais Top to A470
Late 2019[10]Due by 2022[10]Planned
6
A470 Junction to Hirwaun
Late 2019[10]Due by 2022[10]Planned

The section between Llandarcy and Hirwaun is already dual carriageway. Construction works began on section 4 (Tredegar to Dowlais Top) in early spring 2002, and were completed by November 2004. Construction of section 1 (Abergavenny to Gilwer]) began in February 2005. This section is a largely on-line upgrade of the existing single-carriageway road. This section was completed on 22 May 2008.


The contract for Section 3 - Brynmawr to Tredegar was awarded to Carillion Plc in March 2010 with planning commencing soon after, it was announced in August 2012 that approval for the scheme to commence had been given and that construction should commence by the end of 2012 with completion due by early 2015.[11] In keeping with the previously completed sections, a scheme website has been launched.


Planning for Section 2 - Gilwern to Brynmawr started in June 2011 and construction began in January 2015 and is expected to last until 2017.[12] Further information can be found on the scheme's website.


The National Transport Plan, published in March 2010, expected Brynmawr to Tredegar to be completed by 2014 and Gilwern to Brynmawr started by the same date. The remaining sections from Dowlais Top to the A470, and from the A470 to Hirwaun were to be completed by 2020.[13] Speaking in the Senedd in August 2010, the First Minister said completion of the A465 upgrade was the ultimate solution to the high number of casualties on the road.[14]



See also


  • Trunk roads in Wales


References




  1. ^ "A465 HEADS OF THE VALLEYS DUALLING SECTION 3: BRYNMAWR TO TREDEGAR" (PDF). Carillion plc. Archived from the original (PDF) on 2 April 2015. Retrieved 2015-03-10..mw-parser-output cite.citationfont-style:inherit.mw-parser-output qquotes:"""""""'""'".mw-parser-output code.cs1-codecolor:inherit;background:inherit;border:inherit;padding:inherit.mw-parser-output .cs1-lock-free abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-lock-subscription abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registrationcolor:#555.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration spanborder-bottom:1px dotted;cursor:help.mw-parser-output .cs1-hidden-errordisplay:none;font-size:100%.mw-parser-output .cs1-visible-errorfont-size:100%.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-formatfont-size:95%.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-leftpadding-left:0.2em.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-rightpadding-right:0.2em


  2. ^ OS Pathfinder Guide, Brecon Beacons and Glamorgan. Ordnance Survey 1994.


  3. ^ Welsh Government - A465 (Heads of the Valleys Road) - Dualling Scheme Archived 16 May 2013 at the Wayback Machine.


  4. ^ http://hansard.millbanksystems.com/written_answers/1960/feb/17/heads-of-the-valleys-road#S5CV0617P0_19600217_CWA_25


  5. ^ HANSARD 1803–2005 → 1990s → 1992 → June 1992 → 8 June 1992 → Written Answers (Commons) → WALES


  6. ^ http://eclecs.blogspot.com/2006/07/where-is-resolfen.html Cymdeithas Hanes Resolfen History Society


  7. ^ http://www.highwaycodeuk.co.uk/changes-and-answers/new-higher-speed-limits-for-lorries-in-england-and-wales


  8. ^ "Archived copy". Archived from the original on 21 February 2015. Retrieved 2015-02-21.CS1 maint: Archived copy as title (link)


  9. ^ "A465: Gilwern to Brynmawr". Welsh Government. Retrieved 9 November 2018.


  10. ^ abcd "A465 section 5 and 6 Dowlais Top to Hirwaun". Welsh Government. Retrieved 9 November 2018.


  11. ^ http://www.a465brynmawr2tredegar.co.uk/


  12. ^ "title". Archived from the original on 9 January 2013. Retrieved 7 October 2012.


  13. ^
    "National Transport Plan map" (PDF). Welsh Assembly Government. 2010-03-29. Archived from the original (pdf) on 2010-04-02. Retrieved 2010-12-05.



  14. ^
    Williams, Emma (2010-08-12). "Major road is accident blackspot". Merthyr Express. Retrieved 2010-12-05.





External links





Map all coordinates using: OpenStreetMap 

Download coordinates as: KML · GPX
  • Welsh Assembly Government: A465 dualling scheme






Coordinates: 51°50′39″N 3°00′00″W / 51.8442°N 2.9999°W / 51.8442; -2.9999 (A465 road)